Preparing to install exasan b08s2-ps, 1 precaution for handling the system, 2 choosing the location for the system – Accusys ExaSAN B08S2-PS User Manual

Page 30: 3 electrical power, Precaution for handling the system, Choosing the location for the system, Electrical power

Advertising
background image

2. Preparation

User Guide

Page 2-1

2. Preparing to Install ExaSAN B08S2-PS

To ensure safe and smooth operation of your ExaSAN B08S2-PS, it is essential that you choose an
appropriate location for the system, provide an appropriate operating environment, and adequate power
for all components of the system. As you plan for installation, follow the guidelines below to ensure that
the system and its environment are safely and appropriately positioned for efficient operation and service.

2.1 Precaution for Handling the System

Take the following precautions to avoid damage to the system or potential injury to you.
1. Prepare a flat, sturdy surface before removing the system from its packaging. The table or cart that

will hold the system should be as close as possible to the system carton.

2. Ensure that all power switches have been turned off and all power cords disconnected to prevent

personal injury and damage to the hardware.

3. Static electricity can damage electronic components of your system. Follow the guidelines below to

avoid such damage:

a. Work in a static-free environment
b. Wear a grounded anti-static wrist strap
c. Store uninstalled components in anti-static bags
d.

2.2 Choosing the Location for the System

Handle circuit boards by their edges and avoid touching chips and connectors

The ExaSAN B08S2-PS is designed as a small form factor or desktop solution. Depending on where your
desk or other install location is, you should keep the following points in mind when determining where to
place your system.
1. Measure the amount of available space on your desk. The amount of space required for the B08S2-PS

is 265mm(length) x 175mm(width) x 87mm(high)

2. Measure the distance between any two components that need to be connected via cable(s). This

measurement will help you determine the length of the required cable(s). Or if you’ve already
purchased the cables, determine the proximity of the components in question.

3. Leave sufficient room, at least two inches, around the unit to allow air ventilation.
4. Do not block or cover any of the ventilation holes in the front and back panels of the unit. Consistent

airflow is essential to keeping the system operating efficiently.

5. Allow additional room at the front and back of the unit for service.
6. The ExaSAN B08S2-PS uses several cables and cords. It’s a good idea to determine how they will be

arranged at the rear of the system, and where the cables will be routed to connect to the host systems
and RAID disk systems.

2.3 Electrical Power

At your chosen location for the ExaSAN B08S2-PS, make sure that the electrical circuitry and power
outlets are sufficient for the combined power needs of all hardware components. To plan for safe and
adequate power to the system, follow these guidelines:
1. Check the documentation for all hardware components at the chosen location to determine their

power requirements. Then make sure that the available power supply for that location is sufficient for
the planned components.

2. When possible use surge protectors or power conditions as part of the installation.
3. When planning for electrical power, make sure you have more power than the total power

requirements specified for all components. Also make certain that the power load is distributed evenly
among circuits to that location. Consult an electrician or other expert if you need assistance with
planning for the power needs for your components.

Advertising