HR Green Rate Fee Survey Report User Manual

Page 58

Advertising
background image

Site Plan Review

Survey Results

57

o

$5,000 in escrow billed on an hourly basis. Respondent did not provide information on

the community

’s billing rate schedule;

o

Filing fee $275 plus $1,100 in escrow;

o

Basic fee $350 plus a zoning deposit of $350.

For communities with populations between 30,001 and 50,000:

o

Escrow $1,500 for construction projects less than 5,000 sq. ft.; $2,000 for construction

projects between 5,000 and 10,000 sq. ft.; and $2,500 for larger construction projects.
The respondent indicated that if the applicant has a fund balance in the escrow account
these funds will be used for subsequent review activities. If these funds are expended
the applicant will be required to deposit additional funds in the escrow account.

For communities with populations between 70,001 and 90,000:

o

Base fee of $200 plus $3,000 in escrow.

Site Plan Review with a Conditional/Special Use Permit (minor revision):

Population

Fee Range

Median

Low

High

Conditional Use Permit

Low

High

10,000 - 30,000

$300

$200

$750

$150

$900

30,001 - 50,000

N/A

$850

50,001 - 70,000

N/A

$500

$1,000

$500

$1,000

130,001 - 150,000 (1)

N/A

$173


Variations on these flat fees include:

For communities with populations between 10,000 and 30,000:

o

Base fee of $350 plus $2,500 escrowed for 0 to 5 acre site; $3,500 for a 6 to 20 acre

site; and $4,500 for 20 + acre projects;

o

Base fee $600 plus an escrow deposit ranging from $500 to $3,000;

o

$300 for residential projects and $500 for all other projects;

o

Base fee $750 plus $300 for residential CUP or $500 for a commercial CUP;

o

Base fee $250, $600 in escrow, plus an

“unspecified” conditional use permit fee;

o

$5,000 in escrow billed on an hourly basis. Respondent did not provide information on

the community

’s billing rate schedule;

o

Commercial basic fee $325 and zoning deposit of $900. Residential basic fee $150 and

zoning fee $150.

For communities with populations between 30,001 and 50,000:

o

Escrow $1,500 for construction projects less than 5,000 sq. ft.; $2,000 for construction

projects between 5,000 and 10,000 sq. ft.; and $2,500 for larger construction projects.
Plus $1,000 escrow for commercial/industrial CUP application or $480 for residential
projects.

Advertising