HR Green Rate Fee Survey Report User Manual

Page 65

Advertising
background image

64

Variations on these flat fees include:

For communities with populations under 10,000:

o

$25 per hour.

For communities with populations between 10,000 and 30,000:

o

Base fee of $350 plus $7.50 per lot;

o

No extra fee for revision of site plan for building permit;

o

$100 per page;

o

Varies dependent on size;

o

Depends on the revisions.

For communities with populations between 110,001 and130,000:

o

$100 per acre or portion thereof.

For communities with populations between 210,000 and 230,000:

o

Would be filed as a new case and subject to a fee range of $500 to $2,950 depending

upon acreage involved (for a formal zoning change only).

Site Plan Review with a Conditional/Special Use Permit (minor revision):

Population

Fee Range

Median

Low

High

Conditional Use

Permit

Low

High

Under 10,000

$100

$0

$500

10,000 - 30,000

$425

$0

$800

30,001 - 50,000

$0

$250

50,001 - 70,000

N/A

N/A

N/A

N/A

70,001 - 90,000

$200

$0

$325

$0

$1,113

90,001 - 110,000

$0

$500

110,001 – 130,000

$200

$100

$250

130,001 – 150,000

$525

$250

$800


Variations on these flat fees include:

For communities with populations under 10,000:

o

$25 per hour.

For communities with populations between 10,000 and 30,000:

o

Base fee of $500 plus $5 per acre plus $250;

o

None if the change is so minor and no reconsideration by the Planning and Zoning

Commission is required;

o

Included in the SUP which is $450 if less than 10 acres and $1.600 if greater than 10

acres;

Advertising