Stop here – MSD 2960 Atomic LS7 Master Kit Installation User Manual
Page 5
INSTALLATION INSTRUCTIONS
5
M S D
• W W W . A T O M I C E F I . C O M • ( 9 1 5 ) 8 5 5 - 7 1 2 3 • F A X ( 9 1 5 ) 8 5 7 - 3 3 4 4
3. Use the provided torque sequence to torque the
manifold bolts down correctly. Bolts #9 and #10 will
use the stock length bolts/bushings (Figure 10).
4. Check the rail brackets for alignment with a straight
edge (Figure 11).
5. Check the rail brackets for the correct installation
height with a feeler gauge. If there is more than
.015” of clearance, use a shim from the shim kit to
correct (Figure 12).
6. Install the rails onto the manifold. Use the supplied
6mm bolts to secure the rails to the rail brackets.
Torque to 85 in lb – 87 in. lb.
Figure 10
1ST PASS: 42 IN LB - 44 IN LB
2ND PASS: 87 IN LB - 89 IN LB
FRONT
Figure 12
Figure 11
STOP HERE
.015"