Stop here – MSD 2960 Atomic LS7 Master Kit Installation User Manual

Page 5

Advertising
background image

INSTALLATION INSTRUCTIONS

5

M S D

•   W W W . A T O M I C E F I . C O M   •   ( 9 1 5 )   8 5 5 - 7 1 2 3   •   F A X   ( 9 1 5 )   8 5 7 - 3 3 4 4

3. Use the provided torque sequence to torque the

manifold bolts down correctly. Bolts #9 and #10 will

use the stock length bolts/bushings (Figure 10).

4. Check the rail brackets for alignment with a straight

edge (Figure 11).

5. Check the rail brackets for the correct installation

height with a feeler gauge. If there is more than

.015” of clearance, use a shim from the shim kit to

correct (Figure 12).

6. Install the rails onto the manifold. Use the supplied

6mm bolts to secure the rails to the rail brackets.

Torque to 85 in lb – 87 in. lb.

Figure 10

1ST PASS: 42 IN LB - 44 IN LB

2ND PASS: 87 IN LB - 89 IN LB

FRONT

Figure 12

Figure 11

STOP HERE

.015"

Advertising