Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Speed Control- Banks Brake with CBC-SmartLock '04-07 User Manual

Page 31

Advertising
background image

97055 v.8.0

31

Figure 34 All Models Vacuum Solenoid Connection Location

8.

Route the Wiring Harness along the

A.C. hose. Secure it later with cable

ties after you have confirmed there

is enough Harness to reach all the

needed connectors.

9.

Locate the connector for the

Vacuum Solenoid on the Banks Wiring

Harness. Route the wire to Vacuum

Solenoid along the hose connected to

the Solenoid and plug in the connector

to the Solenoid as seen in Figure 34.

Secure the wire and vacuum hose to

the factory wiring harness with cable

ties.

10.

Locate the transmission Intercept

Connectors on the Banks Brake Wiring

Harness and route to the driver’s side

of the transmission.

11.

If installing kits 55225 & 55226,

Locate the factory C108 connector on

the driver side of the transmission.

Disconnect the C108 connector by

sliding the locking tab out and press

the locking clip while removing the

connector. Take the Banks C108

Intercept Harness and insert the Male

Connector into the female connector

on the C108 harness. Insert the

Female Connector on the Intercept

Harness onto the male connector of

the C108 harness. You should feel

and/or hear the connectors lock. Lock

the connectors by sliding the locking

tabs in. Secure the Harness away from

any heat sources and moving parts

with cable ties.

Advertising