Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Speed Control- Banks SmartLock '03-Early 04 User Manual

Page 6

Advertising
background image

is long enough for proper routing
and sealing. For proper installation,
it is required to insert air hose

1

2

” into

the push lock fitting. See Figure 6.

15.

Lower the vehicle.

SMaRTLOCK TRaNS BRaKE
COMPUTER aND HaRNESS
INSTaLLaTION:

NOTE: The following instructions
assume that a Banks Brake system
has been previously installed on the
vehicle.

16.

Locate the large black connector

on the driver side between the
battery and the firewall in the
engine compartment. See Figure 7.
Remove the two (2) plastic screws
on the sides of the connector and
move the connector aside. Retain
the two (2) screws and the two (2)
retainers for re-installation. Locate
the rubber grommet on the driver’s
side firewall below the connector that
was just removed. The SmartLock
wire harness will come through here.
See Figure 8.

17.

Inside the vehicle, remove the

lower dash panel by removing the
two (2) screws along the bottom
of the panel. Retain the screws for
re-installation. NOTE: There are
also two (2) clips located at the top
corners of the panel, which hold the
panel in place. These clips can be
released by gently pulling on the
corners of the panel. Use caution to
avoid damaging the panel during
removal.

18.

Remove the electric connector

bracket on the left hand side of the
support below the steering column in
front of the firewall by removing the
two (2) bolts. keep the two (2) bolts
for re-use. This will gain access to the
inner grommet. See Figure 9.

If necessary, enlarge the hole to allow
the SmartLock wiring harness to pass
through. Be careful not to damage
any vehicle harness.

19.

Locate the 10-pin connector

at the end of the Banks SmartLock

6 |

9 6 9 7 6 v . 2 . 0

Figure 8

Figure 7

Advertising