Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Power Pack & Stinger System & EconoMind, '06-07 Compatible with Banks iQ User Manual

Page 28

Advertising
background image

28

96822 v.4.0

NOTE: Do not tape over the markings

on the template.

22.

Skip to Step 24 to continue.

23.

cut out the supplied template

(see Figure 39-A) and align the

template onto the front of the cluster

bezel by placing its left edge against

the cluster rib, and its bottom edge

against the cluster bottom edge. Use

masking tape to securely hold down

the template.
NOTE: Do not tape over the markings

on the template.

24.

Using a

3

8

” Uni-drill, center the

bit onto the

3

8

” drill location on the

template and slowly drill through the

panel. Using a

1

8

” drill bit, center and

drill through the

1

8

” location on the

template. Remove and discard the

template and any plastic shavings.
NOTE: It is important that the hole is

drilled at the recommended location.

The switch may not clear the

instrument panel structure if the hole

is shifted to another location.

25.

Align the Banks power level

selector label onto the previously

drilled hole. Make sure the entire

mounting surface is clean and free of

dirt and oil before mounting the label.

clean and dry as required using a

cloth dampened with rubbing alcohol

or similar cleaning solution.

CAuTIoN: Do not spray fluid

directly onto any electrical

equipment, or equipment damage

may result.
Mount the Banks power level selector

switch label onto the drilled panel

by peeling the protective backing

off the adhesive tape on the back

of the switch label. Hold the label

against the panel for approximately

20 seconds while applying pressure

to allow the adhesive to properly

adhere to the surface.

26.

Remove the nut and internal

tooth washer from the power level

selector switch. Rotate the shaft

counter clockwise until the shaft

stops. Verify that the locating washer

tab is inserted into the #6 position on

the switch (see Figure 37).
NOTE: If the washer is in any position

other than the #6, your EconoMind

Diesel Tuner will not select power

levels correctly.

27.

After confirming the locating

washer is in the #6 location, install

the switch through the

3

8

” hole

on the backside of the bezel. The

alignment pin should rest in the

1

8”

hole and with the switch fully rotated

counter clockwise; the shaft’s flat

side should be facing the steering

column. Secure switch with internal

tooth washer and nut. Snug the nut.

Be careful not to over torque the nut

and damage the plastic threads.

28.

Install the knob onto the shaft

facing the #1 Level on the power

level selector label. On the knob,

snug the two (2) set screws with the

supplied 0.050” hex key wrench.

29.

Reinstall the removed panels.

Make sure to reconnect all electrical

connecters disconnected previously.

30.

Route the power level selector

switch wires down to the steering

column.

31.

Route the power level selector

switch’s cable to the wire harness

that was routed into the passenger

compartment from the EconoMind

module, and plug the 2-pin connector

into the corresponding connector on

the EconoMind wiring harness.

32.

Re-install the electric connector

bracket that was removed in Step

4 of Section 5 below the steering

column in the front of the firewall

with the original two (2) bolts.

-END, SEcTION 7-

Figure 38-A

Figure 38-B

Advertising