Optional commercial bin well rack & pinion control, Assembly – Grain Systems Unload Augers PNEG-790 User Manual

Page 14

Advertising
background image

14 Pneg - 790 Commercial Bin Well Control Rod Kits & Rack & Pinion Controls

2. ASSEMBLY

Optional Commercial Bin Well Rack & Pinion Control.

F

The optional Rack & Pinion Control can be used with up to three (3) sets

of controls.

The center controller is used to open and close the Center Bin Well.

The two (2) other controls are used to open and close the Intermediate Bin Wells.

Control Rod Kits can be purchased with the rods pre-cut to be ready for use. See

your distributor for more information.

Figure 2D

1. Place the Rack & Pinion Control on the Unload Tube, positioning the control rod sleeves

toward the bin.

2. Turn the control rod sleeves into the housing.

3. Move the Rack & Pinion Control as close as possible to the unload tube flange.

a. Be sure to leave room to reach the flange bolts, especially if frequently installing and

removing the Powerhead.

4. Tighten the Rack & Pinion Control in place by using the half bands and 5/1'' x 1'' bolts and

nuts.

5. Close the Center Bin Well control gate.

6. Turn the control sleeve assembly toward the bin as far as possible.

7. Measure from the Center Bin Well control gate to the hole in the center control rod sleeve.

8. Add 2'' (5.08 cm) to the measurement from

Step 7

.

9. Use the total from

Step 8

and cut a control rod of that length.

10. Attach the control rod to the Center Bin Well control gate.

Bin
Wall

Rack &
pinion
Control

Outer Intermediate Bin
Well Control Rod

Inner Intermediate
Bin Well Control Rod

Center Bin Well Control Rod

Center Well

Advertising