16 Pneg - 790 Commercial Bin Well Control Rod Kits & Rack & Pinion Controls

2. ASSEMBLY

Figure 2E

Operation of the Optional Commercial Bin Well Rack & Pinion Control.

1. Move all the control rod sleeves toward the bin as for as possible.

2. Check to see that all bin well control gates are properly closed.

3. Open the Center Bin Well to the proper flow rate.

a. The control rods must be pulled to open the bin well control gates.

4. NEVER open the Intermediate Bin Wells until grain is no longer flowing from the Center Bin

Well.

a. When it is time to open the Intermediate Bin Wells control gates, they can be opened

one at a time, or all at once.

Be sure the Center Bin Well is also open when the Intermediate Bin Wells

are open.

5. If using the Direct Gear Drive Bin Sweep Auger, open the Center Bin Well control gate as

far as possible, by removing the pin from the center control rod. Then place the control rod
in the CLOSED position, and insert the pin in the second (2nd) hole of the center control
rod.

6. To close the opening, perform

Step 5

in reverse.