2. ASSEMBLY

11. Attach the control rod to the Rack & Pinion Control.

12. Bolt the control rod to the control rod sleeve, using a roll pin or 5/16'' bolt and nut.

a. Available for purchase are Control Rod Guides. Control Rod Guides are

necessary when not using the recommended number of Intermediate
Bin Wells or when there is a larger-than-normal distance between
the bin wells.

b. The control rods MUST be supported. Unsupported control rods can sag causing

misalignment which will cause the controls to grind. This is a misuse of the equipment.
Any misuse of the equipment may void the warranty.

13. Make sure the Intermediate Bin Wells are properly distanced.

14. Make sure the Intermediate Bin Well control gates open toward the center of the bin.

a. The control rods must be pulled to open the bin well control gates.

15. Close all control gates.

16. Know which control rod opens each well.

a. One control rod should control the Center Bin Well.

b. One control rod should control the Intermediate Bin Wells nearest to the

center Bin wall.

c. The control rod should control the Intermediate Bin Wells nearest to the bin wall.

d. The control rods for the Intermediate Bin Wells should each control an even

number of bin wells.

17. Measure from the Intermediate Bin Well control gates clamps to the holes in their

respective control rod sleeves.

18. Add 2'' (5.08 cm) to the measurement from

Step 17

.

19. Cut a control rod the length of the total determined

Step 18.

20. Attach the control rod to the Intermediate Bin Wells it will control.

21. Attach the opposite end to the Rack & Pinion Control.

22. Secure the control rod to the control rod sleeve, using a roll pin or a 5/16'' bolt and nut.