Grain Systems PNEG-900 User Manual

Page 25

Advertising
background image

3. Installation

PNEG-900 Series 2000 Autoflow Fan/Heater and Control Installation Instructions

25

Storage Chamber High-Limit Rotary Switch Installation

1. Drill a 2" diameter hole through the sidewall 3' below the fan/heater.

2. If the bin is 2.66" corrugation, the hole should be centered on an outside hill.

3. If the bin is 4.00" corrugation, the hole should be centered on an outside valley.

4. Use the mounting plate as a pattern and drill four (4) 3/8" holes through the sidewall at the switch

location so the plate can be bolted to the bin.

5. Add foam weather strip around the top and side of the mounting plate.

6. Caulk the underside of the mounting plate, on all sides of the 2" hole and where the plate meets

the bin.

7. Bolt the mounting plate to the sidewall.

8. Attach the flex coupling to the rotary switch power pack using a roll pin.

9. Attach the 1 vane paddle to the flex coupling as shown in

Figure 3P on Page 26

.

10. Apply teflon tape or pipe sealant (not included) to the rotary switch power pack threads and thread

the rotary switch power pack into the mounting plate coupling.

11. Make sure that the conduit hole is facing down.

Figure 3O Storage Chamber Rotary Switch

Advertising