4. Electrical Power Supply

Conduit Runs

Control Wires

Run #1 Autoflow control box to master fan/heater control box.

Five (5) - Control wires 16 gauge minimum. (NOTE: A shielded two (2) conductor 16 gauge cable
should be used for the network connections
.)

Run #2 Autoflow control box to actuator control box.

Five (5) - Control wires 16 gauge minimum.

Run #3 Autoflow control box to wet supply rotary switch.

Four (4) - Control wires 16 gauge minimum.

Run #4 Autoflow control box to storage chamber rotary switch.

Five (5) - Control wires 16 gauge minimum.

Run #5 Autoflow control box to drying chamber rotary switches.

Six (6) - Control wires 16 gauge minimum.

Run #6 Autoflow control box to fill system control box (if applicable).

Eleven (11) - Control wires 16 gauge minimum.

Run #7 Master fan/heater control box to slave fan/heater control box.

Four (4) - Control wires 16 gauge minimum. (NOTE: A shielded two (2) conductor 16 gauge cable
should be used for the network connections.
)

Run #8 Slave fan/heater #1 control box to slave fan/heater #2 control box.

Four (4) - Control wires 16 gauge minimum. (NOTE: A shielded two (2) conductor 16 gauge cable
should be used for the network connections.
)

Power/Motor Wires

Run #1 Entrance panel to master fan/heater control box (for fan motor).

Run #2 Entrance panel to slave fan/heater control boxes (if applicable, for fan motor).

Run #3 Entrance panel to fill system control box (if applicable).

1. For fill system #1 motor starter.

2. For fill system #2 motor starter (if applicable).

3. For aeration fan motor starter.

Run #4 Fill system control box to fill system #1 motor.

Run #5 Fill system control box to fill system #2 motor (if applicable).

Run #6 Fill system control box to aeration fan motor.

Run #7 Entrance panel to actuator control box.

1. 110V AC, 110V N, Ground wire for battery charger.