Peak ring, Roof – Grain Systems Tanks PNEG-257 User Manual
Page 31
Advertising
7. Roof
PNEG-257 12', 15', 18' and 21' Bulk Feed Tanks BFT and GHT Series
31
Peak Ring
The peak ring may now be installed. Again use two (2) strips of caulking between peak ring and roof
panels.
Note that the peak ring goes to the outside of the roof panels.
Figure 7C
Figure 7D
Caulking
Peak ring
Caulking
Advertising