Raising bin, Chapter 11 raising bin, Raising bin to set on foundation – Grain Systems Tanks PNEG-257 User Manual

Page 65: Anchoring tank

Advertising
background image

PNEG-257 12', 15', 18' and 21' Bulk Feed Tanks BFT and GHT Series

65

11. Raising Bin

Raising Bin to Set on Foundation

Be sure that all bolts are tightened properly. The Bulk Feed Tank can now be set up on foundation. A crane
of adequate capacity attached to a spider assembly with cables connecting at each vertical sidewall seam
just above the legs will usually do the job. Reference a qualified rigger.

Anchoring Tank

Check all legs to see if shims are necessary to level the tank properly (shims are to be obtained locally).
After Bulk Feed Tank is level and shimmed properly, anchor the tank down with 5/8" washers and nuts.

(See Figure 11A.)

Figure 11A Leg Base Detail

WARNING

Make sure there is enough clearance between the tank and surrounding power
lines, electricution may occur.

WARNING

All usual and customary precautions must be taken to ensure safety of personnel
and property.