Table 7-1 A-frame installation sequence and temperature cable locations for 75 ft diameter bin (cont'd.)

A-frame number

Rafter Number

Temp Cable Number

Radius Location

A3

R11

—

11.6 ft

R12

T12

26.3 ft

A4

R5

—

11.6 ft

R6

T10

26.3 ft

A5

R20

—

26.3 ft

R21

T6

—

A6

R24

T7

26.3 ft

R25

—

—

A7

R9

T11

—

R10

—

—

A8

R22

—

—

R23

—

—

A9

R7

T4

—

R8

—

—

A10

R18

—

—

R19

T2

—

A11

R3

—

26.3 ft

R4

T9

—

A12

R13

T5

11.6 ft

R14

T13

26.3 ft

R15

—

—

NA

Attach to center collar

T1

5 ft

NOTE: A-frames labeled “A1” through “A5” have X-bracing and are installed first. A-frames labeled “A6”

through “A12” are standard A-frames. The empty spaces that are not labeled must have purlins
installed between the rafters after all the A-frames are secured. The numbers reflect the recom-
mended installation sequence of the A-frame assemblies.

Table 7-2 Starting lengths for temperature cables for 75 ft diameter bins

Length from the center collar

216.1 in. (548.89 cm)

Length from 11.6 ft diameter location

148.5 in. (377.19 cm)

Length from 26.3 ft diameter location

56.6 in. (143.76 cm)

The temperature cable lengths in the chart above are the distances from where the temperature cable
attaches to the rafter or the center collar to the top ring. To calculate the correct temperature cable length,
add 32 inches for each bin ring to the starting length. Temperature cables must terminate above any
unload equipment and be secured in place with twine. DO NOT allow cables to become tangled in unload
equipment.