Drying chamber hilimit rotary switch installation – Grain Systems PNEG-1314 User Manual

Page 8

Advertising
background image

2003 Top Dry Service School

8

3.00”

ROOF MOUNT PLATE

COMPRESSION COUPLER

DRYING CHAMBER HILIMIT ROTARY

SWITCH INSTALLATION

Assemble 1/4” shaft to rotary switch with 1/4”
coupler and rolled pins. Next Screw 1-1/4” pipe
coupler to bottom of rotary switch. Insert 1-1/4”
pip through adjustable roof mount weldment.
Leave 1-1/4” pipe sticking out the top of the
weldment 3” as shown in Diagram. Install paddle
to 1/4” shaft assembly with coupler and rolled pins.
Switch assembly is now ready to mount to roof.

Advertising