Installation – Grain Systems PNEG-1894 User Manual
Page 12
Advertising
4. Installation
12
PNEG-1894 Top Dry Chute Controller
4. Attach the lower mounting gussets (D) to stiffener mounting plate (A) using three (3) flange bolts (E)
and nuts (F) for each mounting gusset.
Figure 4E
Ref #
Part #
Description
A
TD-101327
Stiffener Mounting Plate
D
TD-101326
Lower Mounting Gussets
E
S-6606
Flange Bolt 5/16"-18 x 3/4" ZN Grade 5
F
S-3611
Flange Nut 5/16"-18 YDP Grade 2
Advertising