Installation – Grain Systems PNEG-1894 User Manual

Page 12

Advertising
background image

4. Installation

12

PNEG-1894 Top Dry Chute Controller

4. Attach the lower mounting gussets (D) to stiffener mounting plate (A) using three (3) flange bolts (E)

and nuts (F) for each mounting gusset.

(See Figure 4E.)

Figure 4E

Ref #

Part #

Description

A

TD-101327

Stiffener Mounting Plate

D

TD-101326

Lower Mounting Gussets

E

S-6606

Flange Bolt 5/16"-18 x 3/4" ZN Grade 5

F

S-3611

Flange Nut 5/16"-18 YDP Grade 2

Advertising