Installation – Grain Systems PNEG-1894 User Manual
Page 17
Advertising
4. Installation
PNEG-1894 Top Dry Chute Controller
17
2. Set turnbuckle (D) to the halfway point to allow for adjustment in both directions.
Figure 4J
3. Bolt the turnbuckle to the chain (C).
4. Attach the cable to the turnbuckle using cable clamps (E).
Ref #
Description
C
Chain
D
Turnbuckle
E
Cable Clamps
Advertising