Installation – Grain Systems PNEG-1894 User Manual

Page 17

Advertising
background image

4. Installation

PNEG-1894 Top Dry Chute Controller

17

2. Set turnbuckle (D) to the halfway point to allow for adjustment in both directions.

(See Figure 4J.)

Figure 4J

3. Bolt the turnbuckle to the chain (C).

(See Figure 4J.)

4. Attach the cable to the turnbuckle using cable clamps (E).

(See Figure 4J.)

Ref #

Description

C

Chain

D

Turnbuckle

E

Cable Clamps

Advertising