Installing the housing assembly, Installation – Grain Systems PNEG-1894 User Manual

Page 14

Advertising
background image

4. Installation

14

PNEG-1894 Top Dry Chute Controller

Installing the Housing Assembly

1. Lift the housing assembly onto the lower mounting gussets (A), aligning holes in the bottom

of the chute position controller enclosure with the holes in the lower mounting gussets.

2. Remove cover to attach chute position controller enclosure to gussets with six (6) flange bolts (B)

and flange nuts (C).

(See Figure 4G.)

3. Field drill all four (4) holes in the bin sidewalls through the four (4) holes in the sidewall mounting

brackets (D), making sure that the holes are drilled on the peaks of the corrugation ridges. Use bolts
to attach housing to bin.

Figure 4G

Ref #

Part #

Description

A

TD-101326

Lower Mounting Gussets

B

S-6606

Flange Bolt 5/16"-18 x 3/4" ZN Grade 5

C

S-3611

Flange Nut 5/16"-18 YDP Grade 2

D

Sidewall Mounting Bracket

Chute position controller enclosure weighs approximately 275 lbs. pounds. Failure
to use proper equipment and personnel when lifting could cause bodily injury or
damage to equipment.

WARNING

Advertising