Unload well installation – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1128 User Manual
Page 28
6. Installation
28
PNEG-1128 Chain Loop System without Controls
Unload Well Installation
General Information
Observe the minimum spacings shown in the illustration below.
Wells should be
positioned on the tube so that the gates will open when control pipes are pulled out and away from the
center of the bin.
A control pipe kit may be ordered from your dealer. For the center well, use 1/2" SCH. 40 pipe
(-7/8" O.D.). For the intermediate well(s) use 1" SCH. 40 pipe (-1 3/8" O.D.). It may be necessary to
support the unload well(s) and/or discharge tube from below with blocks or other material.
Consult the manufacturer of the bin floor for information on cutting openings in the floor for unload wells,
for sealing around unload wells and for proper support of the floor around the unload wells and
discharge tube.
Figure 6K