Figure 7-5: Six Trip Units Connected in Parallel to a Single Downstream TIM1 Input Pair

A maximum of six trip units can be connected in parallel to a single DOWNSTREAM TIM1 input pair.

TIM1 Zone Wiring basics:

1.

The lowest breaker in the chain (typically the feeder

breaker) does not have its GFZIN input wired, since there
is no downstream breaker.

2.

The topmost breaker in the chain (typically the Main)

does not have its GFZOUT output wired, since there is
no upstream breaker.

3.

Breakers situated between an upstream and a

downstream breaker will have both their GFZIN and
GFZOUT terminals wired as shown in the diagram.

Figure 7-6: TIM1 Zone Wiring Diagram