3 commissioning, 1 scope of delivery, 2 power supply – YSI TruLab 1310P User Manual

Page 10: 3 initial commissioning, Commissioning, Scope of delivery, Power supply, Initial commissioning, 3commissioning

Advertising
background image

Commissioning

TruLab pH 1310

10

ba76156e01

03/2014

3

Commissioning

3.1

Scope of delivery

pH meter TruLab pH 1310

4 batteries 1.5 V Mignon type AA

Power pack

USB cable

Stand

Stand holder

Comprehensive operating manual

Short instructions

CD-ROM with

– USB drivers
– comprehensive operating manual
– software MultiLab Importer

3.2

Power supply

The TruLab pH 1310 is supplied with power in the following ways:

Mains operation with the supplied power pack

Battery operation (4 x alkaline manganese batteries, type AA)

USB operation via a connected USB-B cable

3.3

Initial commissioning

Perform the following activities:

Insert the supplied batteries

For mains operation: Connect the power pack

If necessary, mount a stand

Switch on the meter (see section 4.2 S

WITCHING

ON

THE

METER

, page 15)

Set the date and time (see section 4.4.6 E

XAMPLE

2

ON

NAVIGATION

: S

ETTING

THE

DATE

AND

TIME

, page 20)

Advertising
This manual is related to the following products: