4 initial commissioning, Initial commissioning – Xylem TURB 430 PORTABLE TURBIDITY METER User Manual
Page 17
Advertising

Turb 430 IR/T
Commissioning
17
ba75507e03
07/2006
3.4
Initial commissioning
Perform the following activities:
! For
– accumulator operation: insert the accumulator pack (see
– line power operation and charging the accumulator pack: connect
the power pack (see section 3.2)
– operation with LabStation: connect the LabStation and place the
Turb 430 IR/T in the LabStation (see section 3.3)
! Switch on the meter (see section 4.1)
! Set the language as necessary (see section 4.3.3)
! Set the date and time as necessary (see section 4.3.4)
Note
When you set the language, date and time according to the mentioned
sections of this operating manual you will quickly become familiar with
the simple operation of the Turb 430 IR/T.
Advertising