7.3

Operation with operating-liquid feed

See Fig. 5, Pg. 18, and Fig. 8, Pg. 19, as well
as Fig. 6, Pg. 19, and Fig. 7, Pg. 19.

Proceed as follows here:

Method A:

1) Set pre-pressure of operating liquid (Fig. 5,
Pg. 18):

 Set a pre-pressure p

A

in the feed pipe for

the operating liquid (Item A) around
approx. 100 kPa [14.5 psi] above the inlet
pressure p

B

in the inlet pipe (Item B).

A

P

A

=P

B

+100 kPa

P

A

=P

B

+14,5 psi

B

6104443001006

Fig. 5: Setting the operating-liquid flow rate:
Setting pre-pressure

A Feed pipe for operating liquid
B Inlet

pipe



2) Start up the unit:

For non-automatic operation (Fig. 6, Pg. 19):

 Open the stop valve (Item 4) manually.

The operating liquid is fed in.

 Switch on the unit.

For automatic operation (Fig. 7, Pg. 19):

 Switch on the unit.
 The solenoid valve (Item 4) opens

and the operating liquid is fed in.


Method B:

1) Start up the unit:

For non-automatic operation (Fig. 6, Pg. 19):

 Open the stop valve (Item 4) manually.

The operating liquid is fed in.

 Switch on the unit.


For automatic operation (Fig. 7, Pg. 19):

 Switch on the unit.
 The solenoid valve (Item 4) opens

and the operating liquid is fed in.


2) Check the operating-liquid flow rate:

 with the flow meter (Fig. 6, Pg. 19, and

Fig. 7, Pg. 19, Item 2)

OR

 by measuring the volume of operating liquid

per unit of time that exits at the discharge
connection with a graduated vessel (Fig. 8,
Pg. 19)


3) Set/correct the operating-liquid flow rate:

 via the control valve (Fig. 6, Pg. 19, and

Fig. 7, Pg. 19, Item 3)

Nominal operating-liquid flow rate:
For nominal values, see Chapter 3.3,
"Operating conditions", Section "Nominal
operating-liquid flow rate", Pg. 8.