Commissioning – Elmo Rietschle L-BV3 User Manual
Page 19
![background image](/manuals/316300/19/background.png)
Commissioning
© Gardner Denver Deutschland GmbH
19 / 32
610.444430.40.000
1
2
3
4
5
6
6104443001008
1
2
3
4
5
6
4a
6104443001009
Fig. 6: Operation with operating-liquid feed:
Non-automatic operation
Fig. 7: Operation with operating-liquid feed:
Automatic operation
1 Pump-motor
unit
2 Flow
meter
3 Control
valve
4 Stop
valve
5 Dirt
trap
6 Feed pipe for operating liquid
1 Pump-motor
unit
2 Flow
meter
3 Control
valve
4 Solenoid valve, connected to motor
4a Bypass with stop valve (for priming)
5 Dirt
trap
6 Feed pipe for operating liquid
A
B
6104443001007
3x
4x
1x
6104443001010
Fig. 8: Setting the operating-liquid flow rate:
Measuring the volume with a graduated vessel
Fig. 9: Maximum permissible quantity of water
entrained via the inlet connection
A Feed pipe for operating liquid
B Drain pipe for operating liquid
3x quantity of operating-liquid flow rate