Franklin Fueling Systems TS-LLD Installation Manual User Manual

Page 30

Advertising
background image

2.2

Page

2.2
-1

2

TS-LLD

INSTALLATION

GUIDE

Figure 2.2-13 Typical Installation INCON TS-LLD Line Leak Detector

INCON TS-LLD Line Leak Detector

Typical Installation in Leak Detector Port

TS-LLD LSU # 1

(Leak Sensing Unit # 1)

at submersible

pump housing

Tank - Pump # 1

Electrical

Power Panel

Pump

Relay

Boxes

NOTE:

A TS-TGI Tank Gauge Interface

module is required to connect

the TS-LLD Line Leak Detector

system to an INCON TS-1000

Tank Sentinel console.
See the TS-TGI Install Manual.

Existing

Conduit

(Pump 2)

Existing

Conduit

(Pump 1)

Submerged

Turbine

Pump

1

2

TS-LLD CUs

(Control Units):

# 2 and # 1

TS-LLD LSU # 2

(Leak Sensing Unit # 2)

at submersible

pump housing

Tank - Pump # 2

Epoxy

Filled

EYS

Seal

Fitting

Dispenser

# A

Explosion-

proof

Junction

Box

Dispenser

# X

NOTE:

A TS-TGI Tank Gauge Interface

module is required to connect the

TS-LLD Line Leak Detector system

to an INCON TS-1000 Tank Senti-

nel console. See the TS-TGI Install

Manual.

For TS-1001/2001 Tank Sentinel

consoles, use the LLD / I interface

...see the OPTIONAL TS-LLD TANK

SENTINEL ATG CONSOLE

INTERFACE chapter in this manual.

Reference Schematic

Figure 2.3 - 8

Advertising