3 mounting rail adjustment – Alpha Technologies FlexNet PMR, GMR Series User Manual

Page 37

Advertising
background image

031-239-C0-003 Rev C

37

Fig. 4-5, Left side

Mounting Rail

(as viewed from

front of enclosure)

Fig. 4-6, PMR Right

side Mounting Rail

(as viewed from

front of enclosure)

Fig. 4-7, GMR Right

side Mounting Rail

(as viewed from

rear of enclosure)

PMR enclosure

PMR enclosure

GMR enclosure

4.0

Equipping the System, continued

4.3 Mounting

Rail

Adjustment

The equipment mounting rails are held in place by #10-32 hardware at the top and bottom
of each rail. The distance between each stud (upper) and threaded hole (lower) is 1". The
seven studs and seven threaded holes provide six mounting positions for specific customer
applications.

To reposition the rails, remove the screws or nuts and slide the rail forward or backward to the
next set of holes or studs and replace the screws or nuts.

Advertising