CEMB USA ER100 User Manual

Page 11

Advertising
background image

11

16

25Nm

15

17

17

use and maintenance manual Rev. 11-2011

ENGLISH

Installation

Drill the holes in the floor using a drill with an 8Ø bit and fit the expandable bolts provided as indicated in the

15.

drawing and tighten them to a torque of 25 Nm. As indicated in the box, in the last phase, fasten the mounting

brackets on the side of the column and tighten to a torque of 25Nm (15) .

Check that the mains input voltage and frequency

16.

parameters are compatible with the data shown on

the wheel balancing machine plate (±10%) (16).

Check proper pneumatic connection; the machine and

17.

the lift require at least 8 kg/cm² (~ 0.8 MPa; ~8 BAR;

~115 PSI) (17).

Turn on the machine and carry out

18.

the following

operations:

Laser caLibraTion

Taper caLibraTion

Machine caLibraTion

Advertising