CEMB USA ER100 (A) User Manual
Page 9
Advertising
9
14
15
Use and Maintenance Manual Rev. 11-2010
ENGLISH
Check that the mains input voltage and frequency
13.
parameters are compatible with the data shown on
the wheel balancing machine plate (±10%) (14).
Check proper pneumatic connection; the machine and
14.
the lift require at least 8 kg/cm² (~ 0.8 MPa; ~8 BAR;
~115 PSI) (15).
Turn on the machine and carry out
15.
the following
operations:
Laser calibration (
▪
manually on board)
Taper calibration (
▪
manually on board)
Machine calibration (
▪
manually on board)
Installation
Advertising