CEMB USA ER100 (A) User Manual

Page 9

Advertising
background image

9

14

15

Use and Maintenance Manual Rev. 11-2010

ENGLISH

Check that the mains input voltage and frequency

13.

parameters are compatible with the data shown on
the wheel balancing machine plate (±10%) (14).

Check proper pneumatic connection; the machine and

14.

the lift require at least 8 kg/cm² (~ 0.8 MPa; ~8 BAR;
~115 PSI) (15).

Turn on the machine and carry out

15.

the following

operations:

Laser calibration (

manually on board)

Taper calibration (

manually on board)

Machine calibration (

manually on board)

Installation

Advertising