Pre-Startup
trained personnel. Prior to chiller startup, there are certain 
essential checks which must be completed. Failure to carry 
out these checks could result in damage to the chiller 
voiding the modules warranty.
Electrical
ơ
and follow proper lock-out/tag-out procedures prior to 
servicing any of the chiller’s electrical components. The 
Ƥơǣ
1.
The installation must be inspected and approved by the 
respective agent and be in compliance with all local and 
national electrical codes.
2.      
ǤUtilize any lock-out/
tag-out procedures required for your project location 
when performing this operation. If no procedure exists, 
take all precautions necessary to prevent the power 
from being turned on. 
Ǥ
ǡ
ǤCheck 
connections at each safety and every termination in 
the panel.
3. Verify that a separate 115 volt power supply is used to
power the CoolLogic Control System. Field connections 
Ƥ
cable daisy chain from the Master Control Panel to the 
modules. These control wires must be two-conductor 
shielded having #18 AWG minimum up to 50 feet, #16 
AWG minimum up to 100 feet, rated at 60°C minimum. 
ƤƤȋȌǤ
Power Distribution Drawing on page 46.
4. Ƥ
Ǥ
5. Check all fuses for proper sizing as indicated on the 
chiller data plate and/or the electrical diagram on the 
inside door of the electrical panel.
6. Verify proper operation of the Ƥ
ơƪǤ
7. ͖͔͜Ȁ͖͔͗ǡ ƤȋȌ
tapped for the measured incoming power supply.
8. Verify proper installation of the  
ǡƤȀ.
Refrigeration
1.
Refrigerant piping and components should be inspected 
for damage.
2. Place refrigerant gauges on the discharge and suction
access ports of each refrigerant circuit to ensure a 
refrigerant charge is present. Leave the gauges on for 
compressor rotation check.
3. ƤǤ
1.
Ƥ Ǥ
2. Ƥ
Ǥ
3. Ƥ
 
in place with both the evaporator and condenser 
water systems. 
4. Ƥ  
water circulating pumps are operational and water is 
ƪ
Ǥ
5. Shut the entering water valve and blow out some
water to check for particles or coloration from 
Ǥ
ơ
across the chiller and condenser heat exchangers, 
measured at the pete’s ports at each module.
6. Ƥ  ƪ
condenser and evaporator. Acquire the design 
parameters for the chiller bank from the ClimaCool 
Selection Program data (available from the local 
ȌǤơ
͙
ƪ
ƪǤ
7. Verify proper installation and electrical termination
ǡƤ
installed temperature sensors and wells ȋ
should be fully inserted in the well) and verify 
calibration of sensors read through the CoolLogic 
Control System.
8. Ƥ Ƥ
condenser and chilled water strainers with a 
͚͔
Ǥ
DANGER
 (OHFWULFVKRFNKD]DUG
 0D\UHVXOWLQLQMXU\RUGHDWK
 'LVFRQQHFWSRZHUVXSSO\LHV
EHIRUHVHUYLFLQJ
 5HIHUVHUYLFLQJWRTXDOLILHG
VHUYLFHSHUVRQQHO
 5LVTXHGHFKRFpOHFWULTXH
 5pVXOWDWGHPDLGDQVGRPPDJHV
RXODPRUW
 'HEUDQFKHUDYDQWGҋHQWUHSUHQGUH
OHGpSDQQDJHGHOҋDSSDUHLO
 &RQVXOWHUXQUpSDUDWHXUTXDOLILH
SRXUOHGpSDQQDJH
DANGER
&$87,21
$77(17,21
 8QLWWREHVHUYLFHGE\TXDOLILHG
SHUVRQQHORQO\
 5HIULJHUDQWV\VWHPXQGHU
SUHVVXUH
 5HOLHYHSUHVVXUHEHIRUHXVLQJ
WRXUFK
 5HFRYHUUHIULJHUDQWDQGVWRUHRU
GLVSRVHRISURSHUO\
 &RQILHUODPDLQWHQDQFHiXQ
WHFKQLFLHQTXDOLILH
 /HV\VWpPHIULJRULILTXHVRXV
SUHVVLRQ
 'pFRPSULPHUDYDQWGҋH[SRVHUi
ODIODPPH
 5pFXSHUpUOHIULJRULJHQHHWOH
VWRFNHURXOHGpWULUH
FRUUHFWHPHQW
RECOVER
REFRIGERANT
WARNING
This unit contains HFC-(R410A), an azeotropic mixture of R-32 (Difluoromethane) and R-125 (Pentafluoroethane). 
DO NOT VENT HFC-(R410A) to the atmosphere. The U.S. Clean Air Act requires the recovery of any residual 
refrigerant. Do not use R-22 service equipment or components on R410A systems.
WARNING!
To avoid possible injury or death due to electrical shock, open the 
power supply disconnect switch and secure it in an open position 
during installation.
CAUTION!
Use only copper conductors for field installed electrical wiring. Unit 
terminals are not designed to accept other types of conductors.