Checking and maintenance, General instructions, Periodic checks – DE DIETRICH ALEZIO AWHP MIV-II User Manual

Page 22: 5 checking and maintenance, 1 general instructions, 2 periodic checks

Advertising
background image

5 Checking and maintenance

5.1

General instructions

CAUTION

4

An annual inspection is compulsory.

4

We recommend taking out a maintenance contract.

4

Maintenance operations must be done by a qualified

engineer.

4

Only original spare parts must be used.

4

Make certain that the flues and chimneys are

connected, in good condition and not blocked.

4

Do not modify nor block the condensate outlet(s).

4

If a neutralisation system is installed, follow the

instructions delivered with the neutralisation system

for cleaning and servicing of this system.

5.2

Periodic checks

4

Check the water pressure in the installation. If the water pressure

is too low, add more water to the installation.
¼See chapter: "Top up the installation with water", page

22.

4

Carry out a visual check for the presence of any water leaks.

4

Open and close the radiator valves several times a year (this

prevents the valves from seizing up).

M002276-B

1

2

3

4

T000181-B

5. Checking and maintenance

AWHP MIV-II

21

23/04/2013 - 300023321-001-03

Advertising