4 stopping the boiler, Close the gas valve, 5 commissioning the boiler – DE DIETRICH C 310 ECO - C 610 ECO User Manual

Page 8: 1 commissioning, Remove the casings on the inspection side, Open the main gas valve, Bleed the heating installation, Fill the siphon with water, Empty the gas inlet, Open the gas valve on the gas pipe to the boiler

Advertising
background image

8

C 310 ECO - C 610 ECO

02/10/07 - 300015183-001-A

4.4 Stopping the boiler

1. Deactivate the electricity supply to the boiler. In this way, any

intergrated regulator is switched off.

2. Close the gas valve.



A boiler which is switched off is not protected against

frost.

4.4.1

Precautions to take if there is a danger of frost

Heating circuit:

Use a correctly dosed antifreeze to prevent the heating water

freezing. If this cannot be done, drain the system completely. In all

cases, consult the fitter.

Domestic hot water circuit:

Drain the domestic water tank and pipes.

4.4.2

Precautions to take in the event of prolonged shutdown (one year or more)

- Close the gas valve

- The boiler and the chimney must be swept carefully.

- Close the door of the boiler to prevent the internal circulation of air.

4.5 Commissioning the boiler

4.5.1

Commissioning

Before filling it with water for the first time, rinse the installation and
eliminate solder pearls, metal shavings, grease, and sludge from the
former installation.
Jobs to be done before commissioning for the first time:
1. Ensure that the boiler is switched off
2. Remove the casings on the inspection side
3. Open the main gas valve
4. Check the electrical connections, particularly the earth
5. Fill the boiler and the installation with water (minimum pressure

1.0 bar)

6. Bleed the heating installation
7. Fill the siphon with water
8. Check the connection of the combusted gas evacuation and the

air inlet

9. Empty the gas inlet
10. Open the gas valve on the gas pipe to the boiler
11. Check the admission pressure of the gas PI
12. Check whether the gas connection is leak proof
13. Activate the electricity supply to the boiler
14. Activate the boiler ON switch
15. Operate the circulation pump and check the assembly position

and the rotation direction

16. Set the boiler regulation according to the heating request
17. The boiler starts to operate
You can monitor operation in the menu #TEST INPUTS, parameter

SEQ:
a. Check the setting of the gas/air ratio and, if necessary, correct it.

The check is carried out at high and low speed, while setting

takes place only on the gas multiblock. For checking and setting,

you will need an electronic CO

2

meter on the basis of O

2

)) and a

gas manometer.Be sure correctly to close the opening around

the sensor when making the measurement. Connect the gas

manometer between the measuring point PG under the gas

multiblock and the measurement point PL on the venturi.

b. Run the boiler at high speed (forced "high speed" mode) by

pressing keys

P%

and

P$

simultaneously for 2 seconds.

TEST EMISSION appears on the display with

.

c. After reaching minimum output, measure the gas value

P at the

measurement point PG under the gas block and the

measurement point PL on the venturi and compare the results

with the values in the table below. Divergent values must be

corrected using the setting screw on the gas multiblock.

d. Then measure the CO

2

percentage and compare it with the value

in the table. If the values exceed the limits shown, correct them

according to the drawing below.

Check the flame via the flame inspection window. It must not go

out.

e. Run the boiler at low speed (forced "low speed" mode) by

pressing keys

P%

and

P$

simultaneously for 2 seconds

then on -. TEST EMISSION appears on the display with



.

f. After reaching minimum output, measure the gas value

P at the

measurement point PG under the gas block and the

measurement point PL on the venturi and compare the results

with the values in the table below. Divergent values must be

corrected using the setting screw on the gas multiblock.

g. Then measure the CO

2

percentage and compare it with the value

in the table. If the values exceed the limits shown, correct them

according to the drawing below.

Check the flame via the flame inspection window. It must not go

out.

Repeat the steps as of step e until the measurements match the

values in the table.
If you do not manage to correct the differences, contact our after

sales service.
h. Remove the measuring device and close the measurement

points.

18. Check the gas seal control and the minimum gas pressure

pressure switch (if need be)

Advertising