Checking and maintenance, General instructions, Diematic isystem control panel – DE DIETRICH INNOVENS PRO MCA 45 - 65 - 90 - 115 User Manual

Page 36: Periodic checks, 6 checking and maintenance, 1 general instructions, 2 periodic checks

Advertising
background image

6 Checking and maintenance

6.1

General instructions

The boiler does not require a lot of maintenance. Nevertheless, we

recommend having the boiler inspected and serviced at regular

intervals.

4

Maintenance and cleaning of the boiler must be carried out at least

once a year by a qualified technician.

4

Have the flues swept at least once a year or more, depending on

the regulations in force in your country.

CAUTION

4

Maintenance operations must be done by a qualified

engineer.

4

We recommend taking out a maintenance contract.

4

Only original spare parts must be used.

4

Make certain that the flues and chimneys are

connected, in good condition and not blocked.

6.1.1.

DIEMATIC iSystem control panel

The boiler displays a message whenever maintenance is necessary.
1. When the message, REVISION, is displayed, press ? to display

the installer's telephone number.

2. Contact the fitter.
3. Have the required checks and services done.

6.2

Periodic checks

4

Check the water pressure in the installation.

If the water pressure is lower than 0,8 bar, more water

should be added. If necessary, top up the water level in the

heating system (recommended hydraulic pressure

between 1,5 and 2,0 bar).
¼ See chapter: "Filling the system", page 36.

bar

1

1

2

2

D

STD

J

I

E

0

2

4

6

8

10

12

14

16

18

22

24

20

#

F

AUTO

% $

<

:



!

SUNDAY 11:45

TEMP. : 68°

PCU COM.FAIL D27

C002302-D-04

6. Checking and maintenance

MCA 45 - 65 - 90 - 115

35

28/08/12 - 300024828-001-01

Advertising