Electrical installation profibus dp – Burkert Type 8750 User Manual

Page 22

Advertising
background image

22

Electrical installation

Typ 8750

10.2. electrical installation profibus dp

procedure:

→

Connect the process controller according to the following tables.

The electrical connection module of Type 8693 features a setscrew
with nut which is used to connect the Technical Earth (TE)
(see “Fig. 13: Connection with PROFIBUS DP”).

→

Connect setscrew (TE connection) to a suitable grounding point.
To ensure electromagnetic compatibility (EMC), ensure that the
cable is as short as possible (max. 30 cm, Ø 1.5 mm

2

).

When the operating voltage is applied, the process controller is
operating.

→

Now make the required basic settings and actuate automatic
adjustment of the process controller, as described in
Chapter “13. PROFIBUS DP start-up”, page 35.

The settings in the

BUS.COMM menu option are described

in Chapter “13. PROFIBUS DP start-up”.

circular plug m12, 4-pole

socket m12, 5-pole

Operating voltage

(inversely coded)
(PROFIBUS DP)

TE terminal

1

2

3

4

1

2

4

3

Pressure sensor P1, P2

circular plug m8, 4-pole

2

1

4

3

5

Fig. 13: Connection with PROFIBUS DP

Socket M12, 5-pole (bus connection)

pin

signal

1

VP+5

2

RxD/TxD-N

3

DGND

4

RxD/TxD-N

5

Shielding

Tab. 10: Socket M12, 5-pole (bus connection)

english

Advertising