Stage 2 - wiring & electrical, 1 - fitting the control panel in the casing, Screws screw positioning holes – CAME Frog-AEP24 Kit User Manual

Page 9: Green connector point fastening screws

Advertising
background image

STAGE 2 - WIRING & ELECTRICAL

2.1 - Fitting the Control Panel in the Casing

8

Securely fasten the control panel PCB to the cas-
ing with the screws supplied.

Plug the green connector from the transformer to
the PCB ensuring that it connects the correct way.

NB FROG Series Motors: connect the black wires
coming out of the board to one capacitor and the
red wires to the other.

Screws

Screw positioning holes

Green connector point

Fastening screws

Advertising
This manual is related to the following products: