General maintenance – Hach-Lange PHOSPHAX sigma Basic User Manual User Manual

Page 108

Advertising
background image

English 108

General maintenance

Cleaning of the device

Clean the device with a soft, damp cloth. For stubborn contamination
you can use a standard cleaning agent.

PHOSPHAX sigma MAINTENANCE SCHEDULE

Number:

Correction Factor:

Commissioning on:

by:

Inspection and repair within the inspection contract

Maintenance work by the user

Every 12 months
Exchange
Filter pad
Teflon piston
Pump cassettes

Every 6 months
Exchange
All seals:
-Cuvette O-rings
-Piston guide
-Hose fittings
Reagent dosing hoses A, C, D
Valve hose
Standard solution if applicable

Every 3 months
Cleaning
Lower cuvette holder
Valve hose

Exchange
Sample- and drain dosing hose
Safety valve seal

Check
Safety panel
Piston system
Current outputs

Every 3 months
Exchange
Reagents

Every 18 months
Exchange
Piston motor
Cuvette

Every 24 months
Exchange
Lower cuvette holder

Advertising