4 prepare the connection tube – Hach-Lange SIGMATAX2 User Manual
Page 20
Advertising
Figure 10
Connection tube
1
Protective tube
3
Connection tube
2
Heat-shrink tube
4
PG 16 screw connection
20
Installation
3.1.4
Prepare the connection tube
D A N G E R
The pipe trace heater in the connection tube is operated at 230 V. If any damage occurs to the
tube casing, the entire system must be taken out of operation immediately.
Advertising