4 prepare the connection tube – Hach-Lange SIGMATAX2 User Manual

Page 20

Advertising
background image

Figure 10

Connection tube

1

Protective tube

3

Connection tube

2

Heat-shrink tube

4

PG 16 screw connection

20

Installation

3.1.4

Prepare the connection tube

D A N G E R

The pipe trace heater in the connection tube is operated at 230 V. If any damage occurs to the
tube casing, the entire system must be taken out of operation immediately.

Advertising