Section 3 installation, 1 assembling – Hach-Lange ULTRATURB sc basic_plus_seawater User Manual
Page 11

11
Section 3
Installation
DANGER
Installation may only be carried out by qualified experts in accordance with
all local safety regulations.
3.1 Assembling
Select an appropriate installation location for the instrument to guarantee
•
safe installation
•
safe operation
•
problem-free maintenance
Plan how to lay cables and hoses and their path in advance. Lay the hoses, data
cables and power cables without any bends. Only original replacement and
accessory parts recommended by the manufacturer may be used.
Make sure the mount has a sufficient bearing capacity. The dowels must be
selected and authorized according to the condition of the wall. The manufacturer
shall accept no liability if the instrument is installed incorrectly.
Install the instrument in a horizontal position.
Fig. 2
Assembling