DANGER
Installation may only be carried out by qualified experts in accordance with
all local safety regulations.

3.1 Assembling

Select an appropriate installation location for the instrument to guarantee

safe installation

safe operation

problem-free maintenance

Plan how to lay cables and hoses and their path in advance. Lay the hoses, data
cables and power cables without any bends. Only original replacement and
accessory parts recommended by the manufacturer may be used.

Make sure the mount has a sufficient bearing capacity. The dowels must be
selected and authorized according to the condition of the wall. The manufacturer
shall accept no liability if the instrument is installed incorrectly.

Install the instrument in a horizontal position.