Run sequence, Run direct measurement – Hach-Lange TITRALAB 840_845 User Guide User Manual

Page 63

Advertising
background image

Running analyses

63

Run sequence

Run sequence

Run sequence

Run sequence

Run sequence

Refer to Short-Form Reminder no. 7.

1.

Install the electrode then the reagent groups to be used to perform
the analysis.

2.

Display the Main window. Press 3 then 1 and prepare the sample
stack.

3.

Display the Main window. Press 1 to start the analysis.

Run direct measurement

Run direct measurement

Run direct measurement

Run direct measurement

Run direct measurement

Refer to Short-Form Reminder no. 8.

1.

Select the method.

2.

Install the electrode group.

3.

Display the Electrodes window.

4.

Press 2 to start the measurement.

5.

Select the electrode in the list. You can stop or start stirring by
pressing 1.

Advertising