Wiring instructions, Left or right hand operation – Controlled Products Systems Group 7200ETL-IL User Manual

Page 11

Advertising
background image

11

Left or Right Hand Operation

operator

Gate in closed position

operator

Gate in closed position

Wiring Instructions

STEP 1. Determine which side of driveway operator will be installed on. The factory units are

plugged into INPUT B for right side installation as shown in Fig. 1.

For left side installation, disconnect from INPUT B and plug into INPUT A on the surge
board as shown in Fig. 2.

Fig. 1

Right Side Installation

Fig. 2

Left Side Installation

Right Side Installation

Red

Black

Green

Orange

White

Left Side Installation

Red

Black

Green

Orange

White

Advertising