Operator installation – Controlled Products Systems Group 7200ETL-IL User Manual

Page 7

Advertising
background image

7

24”

5”

F e n c e

D r i v e w a y

Gate

Inside posts

6”

STEP 2. Remove chain cover and front lid. Mount to posts using the four supplied 3” U-bolts

STEP 1. Install two 3” dia. Posts parallel to the gate as shown. Posts height depends on height

preference of operator.

OPERATOR INSTALLATION

Advertising