9 sawing, 1 before sawing, 2 the first cut (precut) – Diamond Products DZ-S2 User Manual

Page 27: 6dzlqj, Before sawing, The first cut (precut)

Advertising
background image

DZ-S2

Sawing

DZ-S2_e_0210.fm

Page 27



6DZLQJ

 %HIRUH VDZLQJ

Follow the instructions below:

z

Check direction of travel and swivelling
motion

z

Teeth of rails must be clean

z

Cut guides on rail supports must be folded
in

z

Cover sharp-edged objects

z

Check that all dowel screws on the rail
supports have been tightened

z

Check that all rail supports are firmly
secured to the rail

z

Rail limit stops must be mounted

z

Check if water is emerging at the point of
rotation of the saw blade

z

Test run:

Run the wall saw head along the entire
length of the rail and check that the hoses
do not catch at any point

 7KH ILUVW FXW SUHFXW

3URFHGXUH

z

Move wall saw head to starting position

z

Sawing

Never saw without the blade
guard.

Note:

- if possible do not cut through any reinforcements

- swivel arm pulled

- cutting depth 5-10 cm

- working pressure 100-120 bar

5-1

0

cm

Advertising