Installation, Important, Install dock leveler – Poweramp VS SERIES HYDRAULIC User Manual
Page 15
13
4111-0008 — Sept 2012
4. Before installing the leveler the Imbed channel
must be shimmed and welded to the Imbed on the
pit floor.
INSTALLATION
A— Distance (Leveler Frame
Height)
B— Shim Location (Under
Maintenance Prop)
(Standard Dock Leveler
Only)
C— Dock Floor
D— Rear Imbed Frame
E— Imbed Frame
(Maintenance Prop)
F— Pyramid (Preferred)
G— Stepped (Acceptable)
H— Offset (Not Acceptable)
I — Straight (Not Acceptable)
Install Dock Leveler
IMPORTANT
The minimum size of the shim that contacts the
leveler frame (i.e., the top shim of each shim stack)
must be at least 4-1/2 x 4-1/2 in. (114.3 x 114.3
mm) to support the full width of the hoist cylinder /
storage prop weldment.
Use the thickest shim stock possible for stability
and weld penetration purposes. DO NOT use
multiple layers of 1/8 in. (3.18 mm) or thinner shim
stock.
F
G
H
I
Shim
Stacking Methods
B
C
D
A
E
C
B
E