Installation – Poweramp VS SERIES HYDRAULIC User Manual
Page 16

14
4111-0008 — Sept 2012
INSTALLATION
A— Rear Imbed
B— Dock Leveler
C— Maintenance Props
D— Hinge Pins
E— lifting Lug
F— Storage Prop
5. Lube the three rear hinge pins using grease Install
the three pins in the rear imbed only through out
the first hinge tube.
6. lower the Vertical leveler down centering the
leveler’s three hinge pins with the imbeds three
pins.
• Insert the pins. Start with on outside first second
install the center pin and than the last out side
hinge pin.
• Optional use: Us a bottle jack to align the rear of
the dock leveler to the imbed channel.
7. Once the three hinge pins are installed Install the
Storage prop. Install latch pin
8. Make all hydraulic connections.
9. Make all electrical connection.
Note: Do not connect hoist cylinder at this time.
Systems must be bleed before connected see
page 16
The dock leveler is heavy. Use chains and a
lifting device with the appropriate lifting capacity
and reach. Failure to do so may result in damage
to dock leveler and/or serious personal injury or
death.
A
F
C
B
Bottle Jack
D
C
E