Installation – Fulton Reliance (RLN) High Efficiency Cooper Fin Boiler User Manual

Page 29

Advertising
background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 2

RLN-IOM-2012-1205

INSTALLATION

2-23

6. Promptly apply solvent cement to end of pipe and

inside socket surface of fi tting. Cement should be
applied lightly—but uniformly—to inside of socket.
Take care to keep excess cement out of socket. Apply
second coat to pipe end

NOTE: Time is critical at this stage. Do not allow primer to

dry before applying the cement.

7. Immediately after applying last coat of cement to pipe,

while inside socket surface and end of pipe are wet with
cement, insert end of pipe into socket, turn pipe 1/4
turn to distribute cement evenly, continue to insert pipe
until it bottoms out.

DIAMETER "C"

STAINLESS

3 1/2 IN. OR

4.35 CM

AIR GAP

ALL AROUND

THRU PIPE

VARIABLE

(3 1/4 IN. MIN.) - (20 IN. MAX.)

(8.255 CM MIN. - 50.8 CM MAX.)

DIAMETER "B"

ADJUSTABLE

WALL THUMBLE

WIDTH TO VARY WITH

WALL THICKNESS

DIAMETER "A"

COLLAR

END VIEW

SCREW OR BOLT EACH THUMBLE COLLAR

TO WALL (TYPICAL 4 PLACES) ORIENT

COLLAR AND CLAMPS AS REQUIRED

PIPE RETAINING
CLAMP, TYPICAL
EACH SIDE

FIGURE 11 - WALL THIMBLE INSTALLATION

Advertising