Maintenance, General, Daily maintenance and inspection schedule – Fulton Reliance (RLN) High Efficiency Cooper Fin Boiler User Manual

Page 44: Weekly maintenance and inspection schedule, Monthly maintenance and inspection schedule

Advertising
background image

© The Fulton Companies 2012

MAINTENANCE

RLN-IOM-2012-1205

SECTION 4

4-2

!

WARNING

All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.

Prior to any maintenance concerning
electrical components of this
equipment, ensure electrical supply
to the equipment is disconnected.
Label all wires prior to disconnection;
wiring errors may cause improper
and hazardous operation.

Follow all proper lockout/tagout
procedures for service.

Before beginning any maintenance,
ensure area is free of any combustible
materials and other dangers.

What to do if you smell gas:
Do not try to light the appliance.
Do not touch any electrical switch.
Do not use any phone in the building.
Leave building and contact gas
supplier from neighbor’s phone. If you
cannot reach gas supplier, phone the
fi re department.

After initial start-up by qualifi ed
personnel, control settings and fuel
pressures should not be readjusted.

4

CAUTION

All maintenance procedures should
be completed by trained personnel.
Appropriate training and instructions
are available from the Fulton Service
Department at (315) 298-5121 or your
local Fulton Representative.

In order to meet warranty conditions,
ensure all appropriate maintenance
activities are performed.

General

Your Reliance boiler has been designed to provide years of trouble free
performance. To ensure continued safety and effi

ciency of the boiler, please

follow the maintenance and inspection directions outlined in this section of the
manual.

Daily Maintenance and Inspection Schedule

Daily maintenance and inspection must include the following:

1. Observe operating temperature and general conditions.

2. Make sure that the fl ow of combustion and ventilating air to the boiler is

not obstructed.

3. Assure that boiler area is free and clear of any combustible materials,

including fl ammable vapors and liquids.

Weekly Maintenance and Inspection Schedule

Weekly maintenance and inspection must include the following:

1. Observe the conditions of the main fl ame. A normal high fi re fl ame shows

an orange screen with a blue halo. In Low fi re the burner should display a
reddish orange glow.

2. Correct air adjustment is essential for the effi

cient operation of this boiler.

If an adjustment to the combustion is necessary, the fl ue gas composition
should be checked with a carbon dioxide (CO2) or oxygen (O2) analyzer to
set conditions.

Monthly Maintenance and Inspection Schedule

Monthly maintenance and inspection must include the following:

1. View fl ame detection strength via the SOLA Control. See Operation

section of this manual for screen details.

1. Test high-limit control by reducing setting below the operating

temperature. Burner should shut off . Return high limit to previous setting.

2. Test operating temperature control by reducing temperature setting as

necessary to check burner operation.

3. Check fl ue gas temperature at outlet. If there is a temperature increase

over previous readings, the probable cause is soot or water-scale build-up
on the tubes. Consult Fulton Heating Solutions immediately if there is a
concern.

4. Test low gas pressure switch and high gas pressure switch utilizing the

procedure in operation section.

Advertising