Installation, Typical roof penetrations, The fulton companies 2012 – Fulton Reliance (RLN) High Efficiency Cooper Fin Boiler User Manual

Page 30: Figure 12 - roof penetration details

Advertising
background image

© The Fulton Companies 2012

INSTALLATION

RLN-IOM-2012-1205

SECTION 2

2-24

ROOF

SUPPORT

WIRES AND INSULATION

TO COMBUSTABLES,

AIR SPACE CLEARANCES

MAINTAIN MIN 9" / 22.86 CM

NOTE:

AIR INTAKE AND EXHAUST TERMINATION
SHOULD BE SEPARATED AS FAR AS POSSIBLE
TO PREVENT FLUE GAS RECIRCULATION
DURING DIFFERENT WIND CONDITIONS.

4FT / 122 CM

FLASHING

ADJUSTABLE

4" PVC PIPE

FLASHING

ADJUSTABLE

ADHESIVE SEAL

STORM COLLAR

EXHAUST STACK IS DOWNWIND

OF AIR INTAKE OPENING

SCREENED INLET

MIN 4FT / 122 CM

ABOVE AIR INTAKE

PIPING

METAL PLATE

FIRE STOP

DO N OT PLACE
INSULATION
IN REQUIRED AIR
SPACE CLEARANCE

TYPICAL ROOF PENETRATIONS

( SUGGESTED TERMINATION CONFIGURATIONS )

IF SNOW ACCUMULATION
IS APPLICABLE, OPENING
TO BE 1 FT. / 30 CM ( MIN. )
ABOVE THIS NORMALLY
EXPECTED LEVEL.

FIGURE 12 - ROOF PENETRATION DETAILS