Load cell cables – Fairbanks VSX SERIES TRUCK SCALE User Manual
Page 25
                                    Advertising
                                    
                                        
                                    
                                
                                 
Section 2: Installation
04/12
25
51173 Rev. 8
LOAD CELL CABLES,
continued
4. Route the interconnect cables through the angle on the side of the main girder beam
and through the top hole in the stiffener plates at the end of each girder beam.
Figure 2-11
5. Complete installation is accomplished once all of the cables have been run and
the wiring is complete. Tighten all of the cables and hang any excess load cell 
cable on the cable hangers to orderly dress them and keep the load cell cable off 
the ground. 
Figure 2-12
                                    Advertising
                    
                        
                    
                            
                            
                    This manual is related to the following products: