Section 2: Installation

04/12

25

51173 Rev. 8

LOAD CELL CABLES,

continued

4. Route the interconnect cables through the angle on the side of the main girder beam

and through the top hole in the stiffener plates at the end of each girder beam.

Figure 2-11

5. Complete installation is accomplished once all of the cables have been run and

the wiring is complete. Tighten all of the cables and hang any excess load cell
cable on the cable hangers to orderly dress them and keep the load cell cable off
the ground.

Figure 2-12