Section 3: Scale Installation

A. Introduction

Installation consists of the following:

Foundation check, layout, and base plate setting

Tools, materials, documentation, and a crane

Setting the modules

Setting the modules on load cells

B. Tools, equipment and materials required

1. Certified prints
2. A mobile crane of sufficient capacity to safely lift and place the weigh

bridge modules.
Approximate maximum weights:

Factory poured modules – 14,500 lbs., 7.2 tons, ±5% for 23’ x 10’ module

without rub rails.

3. Four (4) equal length (20 ft) lifting chains or cables with hooks to safely

attach to the modules at the lifting points.

Note:

The lifting chains or cables MUST be requested in advance from

the crane vendor.

4. Machinist’s levels (Starrett 134 and 132-6)
5. Hand tools
6. Hammer drill with ⅝” bit, 24”
7. Hydraulic jacks -- Use hydraulic jacks that have sufficient capacity plus (+)

a safety factor for the model of scale you are installing.
• 96496

30 ton jacks

• 96497

Hand pump

• 96498

Hose, 6’

8. 100' steel tape measure
9. String line and / or chalk line
10. Pry bars
11. Grease and anti-seize
12. Load cell locating tools, one for each load cell,

• Part no. 71717 for 5½"

Advertising