Pre-Installation Checklist

The following points should be checked and discussed with the Area Sales

Manager and/or customer, if necessary, before the technician goes to the site

and installs the equipment.

Check the customer's application to make certain it is within the capabilities and

design parameters of the equipment.

If the installation process might disrupt normal business operations, tell the

customer and ask that they make adequate arrangements.

Be sure that the equipment operator(s) are available for training.

The service technician reviews the recommended setup with the

Area Sales Manager or Area Service Manager, and together they

identify all necessary variations to satisfy the customer's

particular application.

Unpacking

Follow these guidelines when unpacking all equipment:

Check in all components and accessories according to the customer's order.

Remove all components from their packing material, checking against the invoice

that they are accounted for and not damaged.

Advise the shipper immediately, if damage has occurred.

Order any parts necessary to replace those which have been damaged.

Keep the shipping container and packing material for future use.

Check the packing list.

Collect all necessary installation manuals for the equipment

and accessories.

Open the equipment and perform an inspection, making

certain that all hardware, electrical connections and printed

circuit assemblies are secure.

Do not reinstall the cover if the final installation is to be

performed after the pre-installation checkout.